360-Degree Painting Powder Coating Line for LPG Gas Cylinders, CNG Cylinder Electrostatic Painting

0 Comments
A. Process flow diagram and Technical Parameter
This line consists of powder coating chamber, booth, curing bake, suspend conveyor and electric control system.
No
Name
Transit time
Working temperature
Operation
1
Loading
RT
Manual
2
Powder coating
RT
Auto+manual
3
Curing
17-18min
180-190℃
Heated air circle
4
Cooling
20min
5
Unloading
Manual

 

B. Drying Oven
The drying tunnel consists of three parts: drying tunnel, heating system and exhaust system.

C. Hang type conveyor
Hang type conveyor consist of driving device, tension device, variable-frequency governor, chain, straight conveyor, bend conveyor, temperature flexible conveyor, inspection conveyor and lubrication system etc. Variable -frequency governor uses Mitsubishi. The speed is 1.4 m/min. The lubrication system uses automatic oil drop device. Hang type conveyor equips with 1 set driving device, 1 set weight-loaded type tension device, using frequency to adjust speed.
longterm-powder coating

Related Equipment

Build-in powder electrostatic spraying system

This equipment is the essence of the international advanced coating technology. It has been carefully designed, developed and manufactured in mold, and is dedicated to the latest built-in spraying machine for customers. The system spray gun uses a built-in high-pressure generator, a unique two-way central gas design for powder bear display, full stainless steel powder barrel and perfect shape design, making the powder electrostatic spraying system the top domestic coating product.
longterm-powder coating
Spray painting gun
longterm-powder coating
Categories:

Leave a Reply

Your email address will not be published. Required fields are marked *